重要提示:请勿将账号共享给其他人使用,违者账号将被封禁!
查看《购买须知》>>>
首页 > 职业技能鉴定> 操作工技能鉴定
网友您好,请在下方输入框内输入要搜索的题目:
搜题
拍照、语音搜题,请扫码下载APP
扫一扫 下载APP
题目内容 (请给出正确答案)
[单选题]

In the control process, to what factor is actual performance compared in order to pro

A.last year's performance

B.competitors' outcomes

C.desired standards

D.last month's efforts

E.management opinion

答案
查看答案
更多“In the control process, to what factor is actual performance compared in order to pro”相关的问题

第1题

What is the passage talking about?A.The features of aluminum and its functions.B.The proce

What is the passage talking about?

A.The features of aluminum and its functions.

B.The process of aluminum.

C.The discovery of aluminum.

D.The promising future of aluminum.

点击查看答案

第2题

According to the text, the best-known form. of ______________ is direct supervision

A.definitional control

B.projected control

C.concurrent control

D.feedback control

E.feedforward control

点击查看答案

第3题

Which of the following is NOT mentioned in the text as a type of control_____

A.cross sectional control

B.feedforward control

C.concurrent control

D.feedback control

点击查看答案

第4题

The stockholders except the chairman of the board whom they elected to organize, direct,________, and supervise the operation of the company.

A.controlling

B.with control

C.under control

D.control

点击查看答案

第5题

The report showed us clearly how the car got ______ and crashed at last.A.into controlB.un

The report showed us clearly how the car got ______ and crashed at last.

A.into control

B.under control

C.within control

D.out of control

点击查看答案

第6题

[A] priority [B] advantage [C] control [D] place

点击查看答案

第7题

The first stop after deboarding the aircraft in another country is().

A.Check-in

B.Passport control

C.Immigration

D.Security control

点击查看答案

第8题

在公司常用的SPC系统是指()。

A.Statistical Process Control,统计过程控制

B.Standard Process Control,标准工艺控制

C.Shipping Control,出货控制

D.Safety Produce Control,安全生产控制

点击查看答案

第9题

If elevator aileron computer ELAC 1 and 2 have failed()

A.Pitch control is provided by the Flight Augmentation Computer

B.Pitch control is achieved by the Spoiler Elevator Computer SEC 2 or 1

C.Pitch control is achieved by the Flight Control Data Concentrators FCDC

点击查看答案

第10题

品质控制部Quality Control()
点击查看答案

第11题

What type of control provides information on planning effort effectiveness and can en

A.concurrent control

B.definitional control

C.feedforward control

D.feedback control

E.projected control

点击查看答案
下载APP
关注公众号
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案 购买前请仔细阅读《购买须知》
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《服务协议》《购买须知》
立即支付 系统将自动为您注册账号
已付款,但不能查看答案,请点这里登录即可>>>
请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
请用微信扫码测试
优题宝